Recover delayed industrial products and accelerate new ones.

When production is stalled by controller failures, firmware issues, or manufacturing bring-up, senior hardware and firmware ownership gets products shipping again.

Engineering outcomes for industrial programs.

  • Controller recovery Root-cause redesign of failing fielded hardware so manufacturing is reliable again.
  • Prototype through production Bring-up, verification, and manufacturing support without tribal-knowledge handoffs.
  • Direct senior ownership Senior engineers from day one - not a chain of juniors and account managers.

Representative projects

  • Industrial controller recovery Root-cause analysis and redesign of failing fielded controllers - restored manufacturing reliability and cut iteration cycles from 12 months to 2.5.
  • Production bring-up, V&V & manufacturing support Repeatable board bring-up, verification, and test automation so builds stop depending on tribal knowledge.
  • Connected industrial products Device connectivity and operations tooling when controllers need to leave the factory network.

Industrial controller recovery

80% faster time to market. 95% controller error rate reduction. A repeatable path from redesign to production.

Read case study

Simplonics reduced our time to market by over 80% while cutting design iterations from 12 months to just 2.5 months.

Hubert N. Head of Engineering · Industrial controller design & manufacturing
  • 80%Faster time to market on industrial controller recovery
  • 95%Controller error rate reduction versus prior baseline
  • 12 → 2.5 moDesign and manufacturing iteration cycle cut

Selected clients
Stiebel Eltron · Simply Pumps · Aveox · Boeing · Carnegie Mellon · Stanford

Download Capabilities PDF

Ready to get industrial products shipping again?

Initial consultations are free.

Schedule consultation